Quotes About Lead times
Digitally enabled supply chains initially increased efficiency and dramatically shortened lead times. Capital was mobile; labor, less so. Economic activity (production, research, design, etc.) moved to any accessible country or region that had relatively inexpensive labor and human capital.
~ Michael Spence
BazillionQuotes.com
For physical goods, there are costs associated with logistics and lead times, owing to inventories and poor forecasts of the market. With digital capital-intensive technology, however, production will inevitably move toward the final market, wherever it is. This re-localization constitutes a major shift in the structure of global supply networks.
~ Michael Spence
BazillionQuotes.com
DevOps practices can be made compatible with ITIL process. However, to support the shorter lead times and higher deployment frequencies associated with DevOps, many areas of the ITIL processes become fully automated, solving many problems associated with the configuration and release management processes (e.g., keeping the configuration management database and definitive software libraries up to date).
~ Gene Kim
BazillionQuotes.com
20% on detailed planning (Their poor throughput and high lead times were misattributed to faulty estimation, and so, hoping to get a better answer, they were asked to estimate the work in greater detail.)
~ Gene Kim
BazillionQuotes.com
When we have long deployment lead times, heroics are required at almost every stage of the value stream. We may discover that nothing works at the end of the project when we merge all the development team's changes together, resulting in code that no longer builds correctly or passes any of our tests. Fixing each problem requires days or weeks of investigation to determine who broke the code and how it can be fixed, and still results in poor customer outcomes.
~ Gene Kim
BazillionQuotes.com
One of the key lessons in Lean is that in order to shrink lead times and increase quality, we must strive to continually shrink batch sizes. The theoretical lower limit for batch size is single-piece flow, where each operation is performed one unit at a time.
~ Gene Kim
BazillionQuotes.com
CONTINUALLY IDENTIFY AND ELEVATE OUR CONSTRAINTS To reduce lead times and increase throughput, we need to continually identify our system's constraints and improve its work capacity. In Beyond the Goal, Dr. Goldratt states, "In any value stream, there is always a direction of flow, and there is always one and only one constraint; any improvement not made at that constraint is an illusion.
~ Gene Kim
BazillionQuotes.com
