logo

Quotes About Iterations

I sort of seen a few iterations of NXT, but the one constant throughout is it's a competitive locker room in a positive way.
~ Pete Dunne
Agile is a process wherein a project is subdivided into iterations. The output of each iteration is measured and used to continuously evaluate the schedule. Features are implemented in the order of business value so that the most valuable things are implemented first. Quality is kept as high as possible. The schedule is primarily managed by manipulating scope.
~ Robert C. Martin
Driving exploration is critical, but knowing when to stop is also. Product development is exploring with a purpose, delivering value within a set of constraints. Frequent, timeboxed iterations compel the development and product teams and executives to make difficult tradeoff decisions early and often during the project. Feature delivery contributes to realistic evaluations because product managers can look at tangible, verifiable results.
~ Jim Highsmith
If you're going to build a lean enterprise, you can test and measure how often the company ships iterations, how often it fails, how often it is putting things in front of people that don't work.
~ Seth Godin
In software, you don't want to release a huge chunk of code only to find out something's wrong with it. You release small bite-sized chunks so you can pick up problems quickly.
~ Roger Connors
I have been part of a lot of recreations. So, I don't think there's any harm in doing recreations if they are done in the correct manner.
~ Tulsi Kumar
My problem with both iterations of 'Dark Phoenix' onscreen, the original by Brett Ratner and the newer version by Simon Kinberg, is, I don't think you can do it effectively in 90 minutes.
~ Chris Claremont
During the three-day mapping activity, the team had numerous discussions about the role of software testing, customer involvement and responsibility, striking the right balance of iterations, and how "minimal" a minimally viable product should be.
~ Karen Martin
If you have a month to plan a project in detail, spend it on four one-week iterations developing while you improve your estimates. If you have a week to plan a project, hold five one-day iterations. Feedback cycles give you information and the experience to make accurate estimates.
~ Kent Beck
I think that, ultimately, there are so many characters in G.I. Joe that even all the iterations - the comics and the different cartoons and everything - have been a big ensemble. Lots of crossing storylines and stuff.
~ D. J. Cotrona
As a rule, software systems do not work well until they have been used, and have failed repeatedly, in real applications.
~ Dave Parnas
I have never seen a script that hasn't gone through at least eight different iterations before they even begin filming, and frequently what is filmed is not what's in the script, because things change on the ground. An actor can't say a particular line. An actor will have a brainstorm and ad lib something utterly brilliant.
~ Diana Gabaldon
See Section 5.6.1.4 of the PMBOK® Guide. For adaptive life cycle software projects, work performance data includes velocity, which is used to help establish a realistic scope of work for subsequent iterations.
~ Unknown
Genome design is going to be a key part of the future. That's why we need fast, cheap, accurate DNA synthesis, so you can make a lot of iterations of something and test them.
~ Craig Venter
If you tie iterations to the ends of months, one out of every three iterations will coincide with the end of a fiscal quarter.
~ Unknown